The area was designed from the beginning with a retaining wall, new rainwater drainage, irrigation system, as well as thermal cables to allow access to the monastery on frosty days.
The entire courtyard was covered with a stamped floor.





| Location : | Evia |
| Area : | 1000sq.m. |
| Year of Construction : | 2018 |
| Interventions : | Study & Construction |
| Duration of work : | 40 days |