Construction of an 8-storey building at 11 Kriezotou Street, Athens

Our company undertook and successfully completed the reconstruction of a new building while maintaining its neoclassical identity. Specifically, in a building constructed in 1923 on Kriezotou Street, demolition works were carried out, reinforcement of the existing brickwork using shotcrete (gunite), excavations, new foundations, construction of a new load-bearing structure made of ductile iron and sandwich […]
New 8-storey apartment building with 12 energy class A apartments

Work on the newly built apartment building began in August 2022. The planning permission is for 2022 and the building will be energy class A. The apartments of the building will have installed: – Ex. Thermoprotection– Aluminium frames Uw ≈ 2,00 w/m²k– Solar selective collector– Modern kitchen– Heat pump EER = 4,50– Pre-installed air conditioning– […]
Landscaping of the courtyard of a Holy Monastery in Evia.

The area was designed from the beginning with a retaining wall, new rainwater drainage, irrigation system, as well as thermal cables to allow access to the monastery on frosty days. The entire courtyard was covered with a stamped floor. Location : Evia Area : 1000sq.m. Year of Construction : 2018 Interventions : Study & Construction […]
Construction of luxury residences within a neoclassical building in Syntagma

Construction of 8 storey residential building in the historical centre of Athens, in Kriezotou Street, Syntagma. The building will consist of a metal load-bearing structure and will extend through existing facades of an existing listed building. Removal of existing floors Internal reform Reinforcement of existing load-bearing structure using shotcrete (Gunite) Installation of a metal temporary […]
New 8-storey building with 7 apartments of energy class A+

PASIONOS 27 The newly built apartment building is in the stage of coating. The planning permission is 2020 and the building is constructed with energy class A+. These new structures will have lower fees under the new legislation and will obviously be much cheaper to operate. The construction materials are of the latest technology and […]
Luxury Villa in Rovies Evoia

Complete construction of a holiday home and landscaping of the surrounding area In this particular seaside residence, our main concern was the exploitation of the entire plot according to the customer’s requirements. Around the house have been created relaxation spaces such as the pool and Daybed, a BBQ area and a basketball court are also […]
Air conditioning in the new EURODRIP offices

An application study of air conditioning and ventilation for the new offices of the factory was prepared.Then the installation of the system was carried out by our qualified crews, where the 1st installation of LG’s MULTI V5 in Attica with two 30HP outdoor units and 28 indoor units was carried out. The completion time was […]
Acropolis Vision – A project with high demands.

It concerns the project in Vasilis Street 2 and Ap.Pavlos in Thiseio. All studies and work had to be done, with absolute respect to the suggestions of the newer monuments authority. The cleaning of the marble hammered elements, from dirt, as well as fire debris were factors, which made the maintenance extremely demanding and time-consuming. […]
Azerbaijan Embassy Building

The complete renovation and reconfiguration of the new building of the Embassy of Azerbaijan was a project that took almost a year. A glance at the exterior of the building reveals the radical change that the façade of the building has undergone, both with the exterior and the casting of wooden panels, and the cladding […]
Luxury residence in Ekali

Housing of high requirements and specifications. After we carried out the studies of the E / M installations for this residence we realized their construction.