An application study of air conditioning and ventilation for the new offices of the factory was prepared.Then the installation of the system was carried out by our qualified crews, where the 1st installation of LG’s MULTI V5 in Attica with two 30HP outdoor units and 28 indoor units was carried out.
The completion time was ten days.









Location : | Oinofyta Attica |
Area : | 500.00τ.μ. |
Year of Construction : | 2017 |
Interventions : | Study & Construction |
Duration of work : | 10 days |