Renovation of high requirements. After the dismantling was done the client wanted to move the kitchen location, so it was done! The only thing that was preserved were the wardrobes which were moved to the new rooms and repositioned. A large part of the external masonry was insulated externally and for reasons of stability the roof was reinforced with cavity beams.
| Τοποθεσία : | Papagou – Attica |
| Εμβαδόν : | 120 sq.m. |
| Έτος Κατασκευής : | 2017 |
| Επεμβάσεις : | Ολική ανακαίνιση |
| Διάρκεια εργασιών : | 60 days |